Established 1980 · ISO 9001:2015 certified since 2017 · Tanzi Dist., Taichung, Taiwan
Stainless steel perforated burner emitters for gas patio heaters, punched and formed at the YBT plant in Taichung, Taiwan

ODM · Taichung, Taiwan

Taiwan ODM manufacturer of gas appliances and precision sheet metal parts

We take outdoor gas appliances from concept through tooling, certification testing and pilot runs to packed finished goods. The same plant also quotes drawing-based stamping, laser cutting and bending for factory buyers.

Since 198046 years in metal manufacturing; own gas products since 1989
ISO 9001:2015TÜV NORD certified since 2017; CE and cETLus certified gas heaters
15 presses25 to 160 t mechanical plus 265 t hydraulic, dies made in house
7 press brakesTRUMPF TruBend 5170 / 3066 and SafanDarley, bends to 2.5 m
5 regionsEurope, North America, Central & South America, Australasia, Asia-Pacific

Two ways to work with us

Which one describes your project?

ODM buyers and parts buyers need completely different information. Pick the path that matches where you are.

ODM & Co-Development

For brand owners, importers and OEM/ODM customers.

You have a concept, a sketch, or an existing product you want re-sourced. You need one supplier to carry it through design, tooling, certification testing and assembly, and to ship a packed unit.

ODM Solutions ›

Manufacturing Services

For factory procurement, engineers and trading companies.

You have drawings. You need a plant that can hold your tolerances on your material and thickness, at your volume, and quote against a defined spec.

Manufacturing Services ›

Not sure which?

If you have a product idea but no drawings, start with ODM. If you have a STEP or DWG file, start with Manufacturing Services.

Both routes are handled by the same engineering team in the same plant.

Request a Quote ›

What we actually manufacture

YBT, registered as YUARN BAAU TAIH ENTERPRISE CORPORATION (business registration 89826223), is a Taiwanese ODM manufacturer founded in 1980 that takes outdoor gas appliances from concept to finished goods. The 6,300 m² plant in Tanzi District, Taichung employs 30 to 40 people and runs its own stamping, laser cutting, bending, welding and assembly lines. It has developed gas patio heaters and commercial gas and charcoal grills in house since 1989, and exports to Europe, North America, Central and South America, Australasia and Asia-Pacific. Its patio heaters hold CE certification under Regulation (EU) 2016/426 (Intertek Italia, Notified Body 2575) and a cETLus listing to CSA/ANSI Z83.26 for North America. Two things separate an ODM supplier from a parts vendor: the ability to carry a product through design, tooling, certification testing and pilot runs, and the ability to ship an assembled, packed unit rather than a carton of components. YBT is set up for both. The same equipment also quotes drawing-based sheet metal work for factory buyers who need stamped, laser cut or bent parts instead of a complete product. Quality management has been certified to ISO 9001:2015 by TÜV NORD since 2017.

ODM

How does an ODM project run from concept to mass production?

Six stages, each with a named deliverable so you always know what you are approving.

  1. Requirement review and feasibility

    We review your concept, target market, target cost and required certifications, then confirm what is manufacturable in metal. We give you: feasibility summary and open-issue list.

  2. Concept and engineering design

    3D model, material selection, gas component sourcing and design-for-manufacture review. We give you: 3D data and draft BOM. Design work is quoted separately when YBT draws the product; most projects start from customer drawings.

  3. Tooling and prototyping

    Stamping dies and fixtures are made in house by YBT’s own toolmakers, followed by a functional prototype. Tooling paid for by the customer belongs to the customer. Samples are charged per run and work starts once the quotation is signed. We give you: prototype unit and dimensional report.

  4. Certification testing

    Submission to an accredited body for your target market. YBT already holds CE (Regulation (EU) 2016/426, Module D) and cETLus (CSA/ANSI Z83.26) certification on its own patio heaters, so the test route is known. We give you: test report and certificate.

  5. Pilot run

    Small-batch production on the real line to validate cycle time, yield and assembly instructions. We give you: pilot units and yield data.

  6. Mass production and finished-goods delivery

    Assembly, packaging and shipment as a complete unit. Finished appliances ship 45 to 60 working days after order confirmation, depending on quantity. We give you: packed goods and inspection records.

How long does the whole route take? A complete new appliance, from first concept through testing and certification to mass production, averages about two years. A tooled component needs at least 45 working days to first production; a part that needs no new tooling can be in production within a week.

Full ODM process detail

Manufacturing services

Which process do you need quoted?

Eight processes quoted as one job, so a part that needs cutting, forming, finishing and assembly is not split between three vendors.

Sheet Metal Stamping

Progressive and single-hit stamping on 15 presses, 25 to 160 t mechanical and 265 t hydraulic. Dies made in house.

Stamping tolerances ›

Sheet Metal Laser Cutting

TRUMPF TruLaser 1040 fiber. Structural steel to 30 mm, stainless to 40 mm, aluminium to 30 mm, accuracy ±0.1 mm.

Thickness range ›

Sheet Metal Bending

Seven CNC press brakes, TRUMPF TruBend 5170 and 3066 plus SafanDarley, bend lengths to 2.5 m.

Bending capacity ›

Perforated Sheet

Perforated panels for burner covers, guards and ventilation on TRUMPF TruPunch 5000 and 1000.

Perforation options ›

Precision Sheet Metal Components

Stamped features held to ±0.05 mm, laser-cut profiles to ±0.1 mm.

Tolerance capability ›

Sheet Metal Fabrication

Multi-process fabrication from raw material to sub-assembly, about 5,000 assemblies a month.

Fabrication scope ›

Server Chassis Manufacturing

Rack cases and chassis for server and data-centre equipment, built to customer drawings.

Chassis capability ›

Surface Treatment & Assembly

Polishing, powder coating, liquid paint and plating, then assembly through to packed finished unit.

Finishing options ›

Capabilities

What equipment we run and what tolerances we hold

Check these figures before you send a drawing.

In-house capability summary
ItemCapability
Press capacity15 presses: 25 t ×4, 80 t ×4, 110 t ×4, 160 t ×1 mechanical; 265 t ×2 hydraulic. Steel sheet to 6 mm.
Press brakes7 CNC press brakes: TRUMPF TruBend 5170 ×2 (170 t, 3 m), TruBend 3066 ×3 (66 t, 2 m), SafanDarley E-Brake 35-1250 ×2 (35 t, 1 m). Bend length to 2.5 m in production.
Laser cuttingTRUMPF TruLaser 1040 fiber (4,000 × 2,000 mm) and TruMatic L 3030. Structural steel 30 mm, stainless 40 mm, aluminium 30 mm.
MaterialsSS400 / SPHC / SPCC / SECC / SGCC carbon steels; SUS304 / 316 / 316L / 301 / 410 / 420 / 430 stainless; AL1050 / 5052 / 6061; C1100 / C2680 / C5191 / C1720 / C7521 copper alloys
ToleranceStamped parts ±0.05 mm; laser-cut parts ±0.1 mm
Monthly capacity, indicativeSmall parts about 20,000 pcs; medium assemblies about 5,000 sets; finished appliances about 3,000 units
Surface treatmentPolishing, powder coating, liquid paint, plating
AssemblyThrough to assembled and packed finished goods, retail cartons and manuals, direct container loading; OTC arc welding robot and laser welding robot
Inspection equipmentSalt spray chamber, surface roughness tester, coating thickness gauge, gas detection equipment

Figures reflect YBT’s in-house equipment and plant records as of 2026. The workable range for a specific part is confirmed at quotation.

Full equipment list

Industries

Where do our parts and products end up?

Outdoor living and leisure metal products manufactured by YBT in Taiwan

Outdoor Living & Leisure

Patio heaters, gas cabinet heaters, outdoor grills and related enclosures.

Outdoor living applications ›
Foodservice equipment sheet metal parts manufactured by YBT in Taiwan

Foodservice Equipment

Commercial grills, burner assemblies and stainless enclosures for kitchens.

Foodservice applications ›
Server rack and data centre chassis parts manufactured by YBT in Taiwan

Server & Data Center

Rack cases, chassis and mounting hardware for server equipment.

Server applications ›
Home appliance sheet metal components manufactured by YBT in Taiwan

Home Appliance

Panels, brackets and internal structural parts for appliance makers.

Appliance applications ›

Quality

How is quality controlled before shipment?

YBT has held ISO 9001:2015 certification from TÜV NORD Taiwan since June 2017 (certificate 66 100 172733, current cycle valid to June 2029, scope: manufacturing of gas heaters, electric heaters and barbecue grills). Its patio heaters carry CE certification under Regulation (EU) 2016/426 with production surveillance by Intertek Italia (Notified Body 2575), and a cETLus listing to CSA/ANSI Z83.26 and CSA 2.37 for North America. In-house inspection covers salt spray testing on coated parts, coating thickness, surface roughness and gas-tightness testing on appliances. Responsibility for a quality issue is settled by its cause: a defect caused in production is YBT’s to correct, a defect caused by the design is the customer’s. For gas appliances, the applicable market certification is obtained through an accredited body before mass production begins rather than after, so the certificate is available when your first container ships.

Certificates and downloads

Frequently asked questions

The questions we are asked most often before an enquiry is sent.

Can you handle a project from concept to finished, packed goods?
Yes. YBT covers design, tooling, stamping, laser cutting, bending, welding, assembly and packaging in one plant, arranges finishing as part of the same job, and ships assembled units rather than component sets. For gas appliances the scope also includes arranging certification testing for your target market before mass production. Deliverable stages run from part design and manufacture, through sub-assembly, to finished-goods assembly with retail carton, manual and direct container loading to port.
What is your MOQ for an ODM project?
The dividing line is tooling. Parts that need no new tooling have a guideline MOQ of 1,000 pcs; parts that need tooling start above 1,000 pcs. There is no hard cut-off: smaller quantities are quoted case by case, with the unit price reflecting the volume.
How long does tooling and mass production take?
A complete new appliance from concept to certified mass production averages about two years. A tooled component takes at least 45 working days to first production and about six months for a full development programme; a part with no new tooling can be in production within a week. Once in production, parts ship in 1 to 2 weeks and finished appliances in 45 to 60 working days, depending on quantity.
What file formats do you accept for a quotation?
DXF, DWG, STEP and PDF. For a drawing-based quote we also need material grade, thickness, quantity, surface treatment and required lead time. Upload them on the quote request form.
Do you sign an NDA before receiving our design?
Yes. YBT signs the customer’s NDA before receiving designs and drawings; the terms are agreed between both parties and signed before any file is exchanged.
Which markets have you exported to?
Europe, North America, Central and South America, Australasia and Asia-Pacific. Products for Europe carry CE certification under Regulation (EU) 2016/426 and products for North America carry a cETLus listing, so both markets’ certification and packaging requirements have already been handled.

All questions

Send us your concept or your drawing

Two separate forms, so you are only asked for what applies to your project.

Request a Quote